Family-house building work, planned before it starts. Free site visit & quote07763 100 477 · · hello@sittingbournebuilders.co.uk
Sittingbourne BuildersSittingbourne · Milton Regis · Kemsley · Murston · ME9 · ME10

← All guides · Guide

Building Regulations sign-off explained

Planning permission and Building Regulations are two different things, and the second one applies to most building work, even when the first does not.

Two different systems

Planning permission is about whether something may be built. Building Regulations are about whether it is built safely and to standard: structure, fire safety, insulation, drainage, ventilation and more. Many projects that do not need planning permission still need Building Regulations approval.

What needs it

Extensions, loft conversions, garage conversions, structural alterations and new drainage generally need approval. Some smaller jobs, such as like-for-like repairs, do not. If in doubt, ask Building Control.

The two routes

Approval can come from the local authority or from a private approved inspector. Either way, the work is inspected at key stages, such as foundations, drainage and structure, before it is covered up.

The completion certificate

At the end you should receive a completion certificate. Keep it safely. You will need it when you sell, and solicitors routinely ask for it.

What we do

We build to the approved details, arrange the inspections at the right moments and keep you informed. We do not cover up work until an inspection that is due has taken place.

Free site visit and quote

Tell us about the project at hello@sittingbournebuilders.co.uk or on WhatsApp. We'll arrange a site visit to give you a proper quote.

Planning to extend, convert or refit? Start with a visit.

Free, no-obligation site visit and quote. Tell us what you are planning, send photos of the house if you can, and we will arrange a time to look at it properly.